About
The new bridge has been completed on Kolb’s Farm East Trail. Before the ribbon cutting ceremony in late June several things need to be completed. The four things that need done are. First, the road / trail needs repaired with GAB, the stuff we used on the horse steps. Second, the large bridge was removed by the contractor. We need to remove the small bridge. And third, we need to reinforce the banks on both sides of the bridge with riprap to prevent erosion around the foundation of the bridge. Riprap is the large irregular stones you see around some bridges. We will also added fencing to both sides of John Ward Creek. VOLUNTEER!! YOUR PARK NEEDS YOU!! If we have more than 6 sign up, I have the authority to increase this to all that sign up. There will be no waiting list for this event. We will meet at the parking lot at the end of Cheatham Hill Drive near the Illinois Monument and park in the field next to the parking lot.
PRACTICAL
TIMES8 AM
AGEall-ages
Related
Kennesaw Mountain National Battlefield - Illinois Monument Parking Lot
park
Atlanta Outdoor Club Hikes and Nature Outings
Ongoing series